Before floor installation, it is necessary to accurately measure the paved area of the room, so as to know the material loss in the whole process of paving.
1. Measure the room area
Before floor installation, it is necessary to accurately measure the paved area of the room, so as to know the material loss in the whole process of paving.
2. Basic treatment
In the formal paving of the floor before the step is the base treatment, mainly to repair the problem ground, the formation of a new base, to avoid the original base because of the hollow drum and crack caused by the floor arch. After doing a good job at the base, it is necessary to level the ground. If the ground is uneven, it will not only lead to gaps in the skirting line, but also uneven the overall floor, and abnormal noise, but also seriously affect the quality of the floor.
3, the ground leveling
The level error of the ground should not be more than 2mm. If it is more than 2mm, it is necessary to find a way to level it. If the ground is uneven, it will not only lead to gaps in the skirting line, but also uneven the overall floor, and abnormal noise, but also seriously affect the quality of the floor.
Keyword:
Recommended News
2023-03-25
What is the lvt floor laying process
2023-03-25
Advantages and disadvantages of PVC flooring
2023-03-25
2023-03-25
No. 713, Yongchang Road, Zhenxing Sub District Office, Chiping District, Liaocheng City, Shandong Province