What is the lvt floor laying process


Published:

2023-03-25

Before floor installation, it is necessary to accurately measure the paved area of the room, so as to know the material loss in the whole process of paving.

1. Measure the room area

Before floor installation, it is necessary to accurately measure the paved area of the room, so as to know the material loss in the whole process of paving.

2. Basic treatment

In the formal paving of the floor before the step is the base treatment, mainly to repair the problem ground, the formation of a new base, to avoid the original base because of the hollow drum and crack caused by the floor arch. After doing a good job at the base, it is necessary to level the ground. If the ground is uneven, it will not only lead to gaps in the skirting line, but also uneven the overall floor, and abnormal noise, but also seriously affect the quality of the floor.

3, the ground leveling

The level error of the ground should not be more than 2mm. If it is more than 2mm, it is necessary to find a way to level it. If the ground is uneven, it will not only lead to gaps in the skirting line, but also uneven the overall floor, and abnormal noise, but also seriously affect the quality of the floor.